Mill direct · Tianjin, China · EN 10219 tube · ISO 1461 galvanising on request Seller of record: XinYonSen +86 150 2264 1456 2268199197@qq.com
Steel frame millTianjin, China · mill direct
RFQ

TECHNICAL 20 · LOGISTICS

Packing and marking: the difference between a frame and a pile of tube.

A frame arrives as several hundred members. If they are not bundled, marked and sequenced, the site crew spends days sorting and the first mistake is a member in the wrong bay.

Slit coil in the mill hall — XinYonSen
Slit coil in the mill hallTianjin mill
Packing conventions we use
ItemConventionPurpose
ArchesNested, 10–20 per bundle, strappedVolume efficiency, no rubbing
GuttersNested in pairs or sets per bay lineAvoid distortion
PurlinsSquare bundles, punched face protectedHole alignment on site
PostsBundled by lengthFast picking
FittingsCartons inside a tube bundle, itemisedNothing lost loose
DoorsFlat, corner-protectedNo twist

Every bundle carries an ID; every member carries a mark that matches the drawing set.

Marking scheme

A workable scheme is two characters plus a number: house (A/B), member type (arch/gutter/purlin/post), and a sequence. “A-ARCH-07” tells a crew everything. Paint or a durable label, on a face that is not a fixing surface.

Edge protection

Steel rubs steel in a container. Contact points lose coating first, and a bare patch in a bundle is the start of a claim. Strawboard, plastic corner strips or timber dunnage at contact points is cheap; a touch-in kit on site is cheaper.

Ask for the packing plan with the quotation

If it is not in the quotation it is decided by the loader, and the loader's priority is the container, not your site sequence.

Open selection list

NEXT STEP

Turn this into a quoted frame list

If this page answered the technical question, the next step is a number. Send the parameters and we will price the tube, profiles, gutters and fittings as one package.

Review & send