TECHNICAL 17 · QUALITY
Tolerances we hold, and the ones you should inspect.
A frame that is 10 mm out over a 40 m gutter will not assemble. Tolerances are cheap to hold at the mill and expensive to fix on site, which is why we publish them rather than argue about them later.

| Feature | Tolerance | Why it matters |
|---|---|---|
| Cut length | ± 2 mm | Accumulated error in a run |
| Hole position | ± 1.5 mm | Clamp fit and pattern alignment |
| Hole diameter | ± 0.5 mm | Bolt fit, no slotting on site |
| Bend radius (arch) | ± 5 mm over the arc | Roof line and cover tension |
| Squareness of frame | ± 3 mm per metre | Racking and door fit |
| Straightness of purlin | ± 3 mm per 3 m | Visible sag between arches |
| Coating thickness | per standard, min at any point | Inspection failure |
Values are our workshop practice; a project drawing may specify tighter and we will quote to it.
The accumulated error problem
A 2 mm error per member is nothing. Two hundred members at 2 mm in one direction is 400 mm, which is why frames are made in repeating sets and why the punching pattern is fixed at the start. If a drawing changes after punching, the change is expensive — that is the real cost of a late design revision.
What to inspect on arrival
- Bundle count against the packing list.
- Member marks against the drawing set (A/B/C, bay numbers).
- One arch against the drawing: span, rise, hole positions.
- One gutter length against the drawing: brackets, outlets, fall.
- Coating: gauge readings at a weld and a cut end.
One habit that avoids claims
Photograph the first arch assembled on site and send it to us before erecting the rest. If something is out, it is one arch, not a house.
Read next
Pages that answer the question this page raises.
- 08.18Inspection checklistGreenhouse frame pre-shipment inspection checklist: documents, dimensions, coating, packin→
- 09.04Quality controlGreenhouse frame quality control: incoming coil, dimensional checks, coating inspection, b→
- 08.20Packing & markingGreenhouse frame packing and marking: bundle plans, member IDs, edge protection, nesting a→
- 08.23InstallationGreenhouse frame installation sequence: setting out, anchors, posts, gutters, arches, purl→
NEXT STEP
Turn this into a quoted frame list
If this page answered the technical question, the next step is a number. Send the parameters and we will price the tube, profiles, gutters and fittings as one package.