MARKET 14 · NORTH AMERICA
United States: imperial sections, high tunnels, and a funded programme.
US buyers often work in feet and inches, and many high tunnel projects are part-funded through NRCS conservation programmes. That changes what the quotation has to state: dimensions in both units, and a structure that matches the programme specification.

US high tunnel projects are frequently specified through the NRCS Environmental Quality Incentives Program, which sets structural requirements the frame must meet. We do not administer that programme and we do not certify compliance — but we can quote to the dimensions, coating and load figures your specification states.
| Item | Note | |
|---|---|---|
| Units | feet/inches + metric equivalent | avoid conversion errors |
| Snow load | psf or kg/m², per local code | section sizing |
| Wind | mph or km/h, exposure | anchors, bracing |
| Programme | NRCS spec if applicable | compliance is yours |
| Coating | Z275 or hot-dip | state humidity |
Imperial dimensions are a real risk in the mill: a 20 ft bay is 6.096 m, not 6 m, and a 1.5 in tube is 38.1 mm, not 38 mm. We convert and confirm in writing before cutting, because a millimetre error repeated 200 times is a frame that does not fit.
A boundary worth stating
We quote steel to your specification. Programme compliance, stamped engineering and site inspection are provided by your engineer or the programme's technical service provider.
Related
Read next
Pages that answer the question this page raises.
- 05.01Multi-span film houseMulti-span film greenhouse frames: 6.2–12 m span, gutter-connected, galvanised oval arches→
- 08.09Container loadingGreenhouse frame container loading: 20GP and 40HQ internal dimensions, 6 m and 12 m tube, →
- 07Export marketsGreenhouse frame export markets: UAE, Saudi Arabia, Kenya, Nigeria, Ethiopia, Uzbekistan, →
- RFQ builderBuild a greenhouse frame RFQ: select tube, profiles, gutters and system lines, add project→
NEXT STEP
Quote a frame for United States
Tell us the site region, the port and the load case. We will send the frame schedule with the coating and packing notes for that route.