COMPANY 04 · QUALITY
Quality control: three checks, and the one that matters most.
Incoming coil, in-process dimensions, and final coating and packing. The check that matters most is the one most suppliers skip: the first bundle, assembled, before the rest is shipped.

| Stage | Check | Record |
|---|---|---|
| Incoming coil | Coating mass, thickness, width, surface | Coil record + mill cert |
| Forming | Section dimensions, wall, ovality | First-off + hourly sample |
| Bending | Radius, ovality after bend, orientation mark | Setup approval per span |
| Punching | Hole position and diameter vs pattern | Pattern check per bundle |
| Welding | Visual, dimension, coating repair | Weld record |
| Coating | Thickness at defined points, bare spots | Coating certificate |
| Packing | Bundle count, marks, protection, fittings | Packing list + photos |
First-off approval happens before the run, not after it.
The check that matters most
Assemble one arch with its purlins and one gutter section on the floor of the works, photograph it, and send the photo with the inspection pack. It catches the failures that dimension sheets miss: a clamp that does not fit the oval, a punch pattern mirrored on one side, a gutter bracket at the wrong height.
Records we keep
- Coil records tied to heat numbers.
- First-off and sample records per run.
- Bend setup approvals per span.
- Coating certificates per batch.
- Packing lists with actual bundle weights.
What we do not claim
We do not hold a current ISO 9001 certificate to show you, and we will not imply one. What we have is a control process and records; if a certificate is a condition of your order, tell us before we quote.
Read next
Pages that answer the question this page raises.
- 09.03FactoryGreenhouse frame factory in Daqiuzhuang, Jinghai, Tianjin: coil, forming, bending, punchin→
- 08.18Inspection checklistGreenhouse frame pre-shipment inspection checklist: documents, dimensions, coating, packin→
- 08.06Zinc coating standardsZinc coating standards for greenhouse steel: Z275 mass coating, ISO 1461, ASTM A123 and GB→
- 08.17Drawing tolerancesGreenhouse frame fabrication tolerances: cut length, hole position, bend radius, squarenes→
NEXT STEP
Verify us before you commit
Ask for the mill certificates, the packing photos or a video call on the line. We would rather answer those questions now than after the deposit.