Mill direct · Tianjin, China · EN 10219 tube · ISO 1461 galvanising on request Seller of record: XinYonSen +86 150 2264 1456 2268199197@qq.com
Steel frame millTianjin, China · mill direct
RFQ

TECHNICAL 01 · SPECIFICATION

Eleven inputs, and a frame quotation that can actually be built.

Most enquiries arrive as “8 m span, 1,000 m², price please”. That is enough to give a number and not enough to give a frame. These eleven inputs turn a price into a purchase order that the mill, the loader and the site crew can all work from.

Slit coil in the mill hall — XinYonSen
Slit coil in the mill hallTianjin mill

The list is ordered by how much it changes the price. The first four usually move the quotation by more than 30 %; the last four decide whether the container arrives complete.

The eleven inputs
#InputWhy it mattersTypical form
1Covered area and shapeSets quantities and the loading planm², plus length × width
2Span and baySets arch and gutter sections8.0 m × 4.0 m
3Eaves / gutter heightSets post length and bracing4.5 m
4Load caseSets wall thickness and spacingsnow kg/m², wind m/s
5CoveringSets purlin spacing and clips150 μm film / 8 mm PC / 4 mm glass
6Vent patternSets vent hardware and purlin gapsridge + side roll-up
7Crop supportSets rails, wire and bench loadshigh wire at 4 m
8CoatingSets process and priceZ275 pre-galv / hot-dip
9Fittings scopeSets the BOMframe only, or frame + clips + doors
10Packing and markingSets bundle plannested, cut to bay, marked A/B/C
11DocumentsSets what clears customsmill cert, PL, invoice, CO

Numbers 1–4 are the price drivers. Numbers 9–11 are the delivery drivers. Both matter.

What we do when an input is missing

We state the assumption we would have made, mark it in the quotation, and quote with it. That way the number is usable immediately and the assumption is visible. We do not silently pick a snow load, because a snow load is a design decision.

The one input we will not fill in

The design load case. If you do not have a snow or wind figure, we will quote a reference case and say so in writing — but the structure you build must be signed off by an engineer who knows your site.

A worked example

Enquiry → order, one pageXY-EXAMPLE-01
Area
1,000 m² (25 × 40 m)
Span / bay
8.0 m / 4.0 m
Eaves
4.5 m
Load
snow 15 kg/m², wind 100 km/h
Cover
150 μm film, ridge + side vent
Support
high wire rails at 4.2 m
Coating
Z275, cut ends touched in
Scope
frame + clips + 2 door sets
Packing
nested, 4 m cut, marked
Docs
mill cert + PL + invoice
Delivery
FOB Tianjin
Quotation
3–5 working days
Drawing
with the quotation
Lead time
20–28 days
Indicative values — the quotation and mill certificate carry the final figures.Rev. 2026-11
Open selection list

NEXT STEP

Turn this into a quoted frame list

If this page answered the technical question, the next step is a number. Send the parameters and we will price the tube, profiles, gutters and fittings as one package.

Review & send