What a third-party inspector asks for, in the order they ask.

An inspection is usually a pre-shipment visit with a checklist. Knowing the checklist in advance is the difference between a clean pass and a week of rework at the port.

Slit coil in the mill hall — XinYonSen
Slit coil in the mill hallTianjin mill
Pre-shipment inspection, typical sequence
StepInspector checksDocument
1PO vs mill certificate: grade, heat numbersMill cert (EN 10204 3.1 or 2.2)
2Quantities vs packing listPacking list
3Dimensions: length, holes, bendDrawing + tolerance sheet
4Coating thickness at defined pointsCoating certificate
5Visual: bare spots, welds, cut ends touched inPhoto record
6Bundle integrity, edge protection, lashing pointsLoading plan
7Marking: bundle ID, member ID, orientation marksMarking scheme
8Fittings count and packingBOM

Steps 1, 4 and 7 are where most findings are raised.

The three findings that actually occur

  • Coating missing at cut ends or welds — because the PO said the coating class but not the process.
  • Marking absent or illegible — because the marking scheme was never agreed.
  • Fittings short — because a carton was counted as a bundle or packed loose.

Who pays for the inspection

Normally the buyer, and it is worth it on a first order. On repeat orders with a stable specification it is often reduced to a photo report. We accept third-party inspectors on site and will supply the documents in advance so the visit is inspection, not document collection.

What we will not do

We will not issue a certificate we are not entitled to issue, and we will not describe a reference configuration as a certified design. If an inspector asks for a design certificate, it comes from your engineer.

Open selection list

Questions this page answers

What coating do you use?

Pre-galvanised Z275 coil for roll-formed members, or hot-dip after fabrication to ISO 1461 where the project specifies it.

Is Z275 the same as hot-dip?

No. Z275 is a coil mass designation, about 20 μm per side, and cut ends are bare. Hot-dip coats the finished part including cut ends and welds.

Can I inspect before shipment?

Yes, in our works, and we will issue documents in advance. Third-party inspectors are welcome; the cost is yours.

What certificate do I get?

Mill certificate per heat number (EN 10204 2.2 or 3.1 as agreed), plus a coating certificate. We do not issue design certificates.

What tolerance do you hold?

Cut length ±2 mm, hole position ±1.5 mm, bend ±5 mm over the arc, squareness ±3 mm per metre. Tighter on request, quoted separately.

What if something is wrong on arrival?

Photograph it, mark the bundle, and send us the photo with the bundle ID. We replace or credit per the agreed terms; we do not ask you to prove it twice.

Do you have ISO 9001?

We will state exactly what we hold and what we do not, in writing, rather than imply a certificate. Ask for the current certificate and check the scope and the expiry date yourself.

Are your certificates current?

Some of our certificates have expiry dates that have passed, and we do not present them as current. Ask which are valid today and we will answer with dates.