CROP 01 · STRUCTURE NOTES

Tomatoes want height, air and a wire that does not sag.

Indeterminate tomatoes are trained up a wire and picked for months. That makes eaves height, crop-support strength and vent capacity the three structural decisions — span comes fourth.

Arched tunnel seen through the film — XinYonSen
Arched tunnel seen through the filmProject photo

A tomato house is tall because the crop is tall and because the air above the canopy is the buffer that stops temperature swinging. Low houses with the same floor area carry less air, ventilate worse and produce a harder climate to manage. Height is not a luxury line in the quotation; it is the climate system.

Structural decisions a tomato plan forces
DecisionWhy the crop forces itTypical value
Eaves heightWire height + canopy + air buffer4.0–6.0 m
SpanBed layout and internal transport8.0–9.6 m
Crop supportFruit truss load on the wireØ33.5 rails at 1.5–2.0 m
Vent areaHumidity control at canopy level15–25 % of floor
Roof pitchCondensation drip away from fruitper design

The crop-support rail is the member that gets forgotten and then overloaded. It is usually a Ø33.5 tube spanning between posts, carrying tensioned wire. If the rail spacing is stretched, the wire sags, the trusses hang lower and picking slows down. We quote the rail and the wire hooks as separate lines so the quantity is visible.

What to send with a tomato enquiry

Row spacing, wire height, expected truss load per metre, and whether the house needs a ridge vent or only side vents. Those four set the height and the purlin pattern.

Open selection list