Daqiuzhuang: coil in, frame out, container at the gate.
The works sits in Tianjin's tube cluster: coil supply, forming lines, bending, punching, welding and a galvanising partner within reach. What follows is the process a frame goes through, not a list of machine names.

Coil
Pre-galvanised coil, Z275, checked for coating mass and thickness before it enters the line.
Forming
Tube rolled and cut to length; profiles rolled to the drawing.
Bending
Arches bent to radius on a setup per span; ovality checked after bending.
Punching
Holes punched to the clamp pattern, one pattern per house.
Welding
Where a joint must be a joint: trusses, base plates, door frames.
Coating
Pre-galvanised retained, or hot-dip at the partner plant after fabrication.
Packing
Nested bundles, marked by house and member, fittings packed inside.
Capacity, stated as capability
| Capability | Range | Note |
|---|---|---|
| Tube outside diameter | Ø6–1,200 mm | Round |
| Wall thickness | 0.5–16 mm | Depends on section and mill |
| Single length | up to 16 m | Longer requires a special arrangement |
| Sections | Round, oval, SHS/RHS, C/Z, gutter | Oval arches bent in-house |
| Cutting | to order length | ±2 mm |
| Bending | to a stated radius | ±5 mm over the arc |
| Punching | to pattern | ±1.5 mm hole position |
Capacity is what we can produce, not a stock list. Stock changes weekly; ask for what is on the floor today.
What a factory visit shows
Coil storage, the forming line, a bending setup, the punch pattern for a live order, the bundle yard and the loading bay. It also shows what is not there: no glass line, no glazing assembly, no climate control integration. That is the scope boundary made physical.
Visits
Buyers and inspectors are welcome by appointment. If you cannot travel, we will do a video walk-through of the specific order — not a marketing film.
Read next
Pages that answer the question this page raises.
- 09.04Quality controlGreenhouse frame quality control: incoming coil, dimensional checks, coating inspection, b→
- 09.01AboutAbout Tianjin XinYonSen Agricultural Technology: greenhouse frame material and frames from→
- 08.17Drawing tolerancesGreenhouse frame fabrication tolerances: cut length, hole position, bend radius, squarenes→
- 08.18Inspection checklistGreenhouse frame pre-shipment inspection checklist: documents, dimensions, coating, packin→
NEXT STEP
Verify us before you commit
Ask for the mill certificates, the packing photos or a video call on the line. We would rather answer those questions now than after the deposit.