Mill direct · Tianjin, China · EN 10219 tube · ISO 1461 galvanising on request Seller of record: XinYonSen +86 150 2264 1456 2268199197@qq.com
Steel frame millTianjin, China · mill direct
RFQ

TOOLS 02 · CHECKLIST

The eleven-input checklist: fill it in, and the quotation is buildable.

This is the same list we use internally. If you can answer eight of the eleven, we can quote firmly; if you can answer four, we can quote with the assumptions written down.

Round tube bundles, stacked in the mill — XinYonSen
Round tube bundles, stacked in the millTianjin mill

Copy this into an email, or use the RFQ page which asks for the same fields in order. The right-hand column tells you what the input changes, so you can decide how hard to argue about it.

Fill in the right column
#InputWhat it changesYour value
1Covered area and shapeQuantities, loading plan
2Span and bayArch and gutter sections
3Eaves / gutter heightPost length, bracing, film
4Load case (snow kg/m², wind m/s)Wall thickness, spacing, anchors
5Covering (film / PC / glass)Purlin spacing, fixings
6Vent patternVent hardware, purlin gaps
7Crop supportRails, wire, bench loads
8Coating (Z275 / hot-dip)Process, price, inspection
9Fittings scopeThe BOM
10Packing and markingBundle plan
11Documents requiredWhat clears customs

Print this page: it is laid out for A4 and the last column is wide enough to write in.

The four that move the price

Items 1–4 usually move a quotation by more than 30 %. If you only have time for four answers, answer those and let the rest be assumptions. We will mark every assumption in the quotation.

One item we will not guess

The load case. If you do not have it, we quote a reference case and say so. Your engineer signs the real one.

Open selection list

NEXT STEP

Take the numbers into a real enquiry

The calculator gives you a planning figure. The quotation gives you a price, a packing list and a delivery date.

Review & send