TECHNICAL C03 · COMPARISON
Frame only or turnkey: where our scope stops, and why that is the honest answer.
A turnkey greenhouse includes design, cover, climate, irrigation and commissioning. We supply steel. Pretending otherwise is how buyers end up surprised.

A comparison is only useful if it names the trade-off. Below is the same table we use internally when a buyer asks which option is “better”.
| Criterion | Option A | Option B |
|---|---|---|
| Structural design | Yours | Supplier's |
| Steel frame | Ours | Supplier's |
| Cover | Optional line | Included |
| Climate / irrigation | Not in scope | Included |
| Installation | Your contractor | Supplier or partner |
| Commissioning | Not in scope | Included |
| Certificate | Mill + coating | Design + as-built |
| Price | Lowest | Highest |
The frame-only route is cheaper and faster, and it puts design responsibility where it belongs — with your engineer. If you need a single contract, a turnkey supplier is the right choice, and we will quote the steel package inside it.
No recommendation without a project
We will not tell you which is better in general. Send the crop, the climate and the budget, and the answer becomes specific.
Related
Read next
Pages that answer the question this page raises.
- 09.02Entity structureEntity structure: Tianjin XinYonSen Agricultural Technology as seller of record and Tianji→
- 08.16EN 13031-1EN 13031-1 greenhouse design standard explained: scope, loads, snow annex, and what a supp→
- RFQ builderBuild a greenhouse frame RFQ: select tube, profiles, gutters and system lines, add project→
- 08.01Specify a frameHow to specify a greenhouse frame: span, bay, eaves, load case, covering, coating, fitting→
- 08Technical libraryTechnical guides for greenhouse frame specification: span and bay, snow and wind load, gal→
NEXT STEP
Turn this into a quoted frame list
If this page answered the technical question, the next step is a number. Send the parameters and we will price the tube, profiles, gutters and fittings as one package.